PROJECT NAME
Penn District Water Supply
OWNER OF THE PROJECT PROPOSAL
Country: Jamaica Institution: St. Catherine Municipal Corporation Contact Person: Contact Number: Office Address:
PROPOSED COORDINATOR INSTITUTION – EXECUTING AGENCY
Rural Water Supply Limited
PROJECT BACKGROUND
PROJECT COMPONENTS -Construct sump -Build pumping and chlorine house -Supply and install transmission and distribution pipelines -Supply and install solar pumping system -Install water storage tanks
PROJECT LOCATION
Penn District, St. Catherine
POSSIBLE PARTIES
St. Catherine Municipal Corporation
RELEVANCE OF THE PROJECT
Provision of potable water to the residents of Penn District
OVERALL AND SPECIFIC PROJECT PURPOSE
To construct a water supply system to provide potable water to the residents of Penn District
PROJECT OUTPUTS
A solar pumping system to pump water from the local spring to an elevated tank -Water tank at an elevated point to store water -Pipeline to facilitate the pumping of water from the local spring to an elevated tank -Pipeline to facilitate the distribution of potable gravity fed water to the surrounding community
POSSIBLE RISKS/ASSUMPTIONS
There is the potential risk of equipment being stolen after installation, however, this risk is considered minimal
DURATION OF PROJECT
The project is estimated to have a duration of six (6) months
SOURCE OF FINANCE
Government of Jamaica, Ministry of Economic Growth and Job Creation (MEGJC)