Projects

Status: in_progress St. Elizabeth, Maybole

Maybole Water Supply Upgrade

 

 

 

NAME OF PROJECT:

 

Maybole Water Supply Upgrade
LOCATION OF PROJECT:

 

St. Elizabeth
SCOPE OF PROJECT:

 

 

 

 

 

  • Upgrade of existing intake system

 

  • Supply and install a solar photovoltaic pumping system

 

  • Installation of transmission pipeline

 

  • Installation of distribution pipeline

 

  • Installation of elevated storage tank
 

ACTUAL COST:

 

$48,138,682.32M

 

 

POPULATION:

 

 

N/A

 

Transmission pipeline

 

14,000 US Gallon Tank

 

Installation a solar panel