Projects

Status: in_progress St. Ann, John Reid

JOHN REID RAINWATER CATCHMENT TANK

PROJECT OVERVIEW

NAME OF PROJECT:

 

JOHN REID RAINWATER CATCHMENT TANK
LOCATION OF PROJECT:

 

St. Ann
SCOPE OF PROJECT:

 

 

 

 

  • Repairs to the concrete Bar-B-Que

 

  • Replace Link Fence to concrete Bar-B-Que

 

  • Painting to Existing Tank House and Storage Tank

 

  • Construction  of new perimeter  fencing with concrete fence post and five strand of barbed wire

 

  • Repair to heavily pitted sections of Welded  Steel Tank

 

  • Painting inside walls of Steel Tank with Thixopoxy

 

  • Painting outside wall of Steel Tank with Berger 404 or similar

 

 

ACTUAL COST:

 

$25,000,000.00M

 

 

POPULATION:

 

 

2000