NAME OF PROJECT: | Hamwalk/Redwood Water Supply |
LOCATION OF PROJECT: | St. Catherine |
SCOPE OF PROJECT: | – Refurbishing of intake
– Installation of Gabion Basket pipe projection in river – Laying of 4” GI, PVC and HDPE pipes – Construction of 30,000 gal reinforced concrete reservoir – Construction of Pump and Chlorinator House – Construction of 10,000 gal reinforced concrete sump – Supply and Install pump – Supply and Install Chlorination system – Install Fencing around pump house and reservoir sites |
ACTUAL COST:
(to date) |
J$63,431,413.46 |
POPULATION:
|
Hamwalk – 330
Redwood – Approx. 3,000 |
MEMBER OF PARLIAMENT: | Ms. Kerensia Morrison |
OWNERS/OPERATORS: | National Water Commission |
Hamwalk/Dover Castle Water Supply
