Projects

Status: completed St. Catherine

Hamwalk/Dover Castle Water Supply

NAME OF PROJECT: Hamwalk/Redwood Water Supply
LOCATION OF PROJECT: St. Catherine
SCOPE OF PROJECT: –          Refurbishing of intake

–          Installation of Gabion Basket pipe projection in river

–          Laying of 4” GI, PVC and HDPE pipes

–          Construction of 30,000 gal reinforced concrete reservoir

–          Construction of Pump and Chlorinator House

–          Construction of 10,000 gal reinforced concrete sump

–          Supply and Install pump

–          Supply and Install Chlorination system

–          Install Fencing around pump house and reservoir sites

ACTUAL COST:

(to date)

 

J$63,431,413.46

POPULATION:

 

Hamwalk – 330

Redwood – Approx. 3,000

MEMBER OF PARLIAMENT: Ms. Kerensia Morrison
OWNERS/OPERATORS: National Water Commission