Banga Ridge Water Supply

PROJECT OVERVIEW

NAME OF PROJECT:

 

Banga Ridge Water Supply
LOCATION OF PROJECT:

 

 

Portland

SCOPE OF PROJECT:

 

 

 

 

  • Phase One: Rehabilitation of the Rain Water Catchment Tank

 

  • Phase Two: Repair sections of the distribution & Transmission pipeline

 

  • Phase Three: Construction of a new intake to increase the volume of water available to supply the community of Banga Ridge & it’s surrounding communities, to include the installation of a new transmission pipeline.

 

  • Phase Four: To Rehabilitate the old source to proper channel the raw water to the intake, Investigate transmission and distribution pipeline to identify all/most leaks and blockages along the pipeline to fix all if not most leaks and create a full report on the status of the pipeline

 

 

ACTUAL COST:

 

$34,684,297.46M

 

 

POPULATION:

 

 

750