Projects

Status: in_progress St. Elizabeth, Rose Valley

Roses Valley Primary School Rainwater Harvesting

PROJECT OVERVIEW

NAME OF PROJECT:

 

Roses Valley Primary School Rainwater Harvesting
LOCATION OF PROJECT:

 

St. Elizabeth
SCOPE OF PROJECT:

 

 

 

 

  • Excavation for Tank construction

 

  • Construct a 20,000 gallon Block and Steel Tank

 

  • Install 8” galvanized metal guttering

 

  • Install conveyance pipes

 

  • Install pump and distribution piping to tie back into main building plumbing

 

  • Install Chlorination system

 

  • Install Filtration system

 

  • Install Solar system

 

  • Repair existing concrete water tank

 

 

ACTUAL COST:

 

$7,000,000.00M

 

 

POPULATION:

 

 

106