Projects

Status: in_progress St. Mary

Fellowship Hall Basic School Rain Water Harvesting

PROJECT OVERVIEW

NAME OF PROJECT:

 

Fellowship Hall Basic School Rain Water Harvesting
LOCATION OF PROJECT:

 

 

Portland

SCOPE OF PROJECT:

 

 

 

 

  • Supply and install 8” PVC Water Harvesting Gutters on one side of Church building

 

  • Lay 6” blocks around the perimeter of concrete roof of church building at the back of the premises. This roof will now act as a cathment.

 

  • Construct a ground level tank base to host 4 black tanks

 

  • Supply and Install Conveyance Pipes & Supply Pipes

 

  • Supply and install four (4) 1000 gallon PVC black tank.

 

  • Supply and install six (6) 1000 gallon PVC black tanks and one (1) 600 gal tank

 

  • Supply and install a 1 HP pump and Solar Panels
 

ACTUAL COST:

 

$1,442,294.68M

 

 

POPULATION:

 

 

39