Status: Trelawny, Albert Town

Rainwater Harvesting Project Albert Town High School

PROJECT OVERVIEW

NAME OF PROJECT:

 

Albert Town High School Rainwater Harvesting Project
LOCATION OF PROJECT:

 

Trelawny
SCOPE OF PROJECT:

 

 

 

 

 

  • Supply and Install 100 No. of 6″ blocks on top concrete roof

 

  •  Supply and Install 350 feet of  8″ PVC Water Harvesting Gutters

 

  • Construct a 20,000 gallon block and steel tank

 

  •  Supply and Install 4″ Conveyance Pipes especially below ground

 

  • Supply and Install 1 1/2″ Supply Pipes

 

  • Supply and Install six (6) 800 gallon PVC black tank

 

  • Supply and Install a 1 HP pump and electrics

 

 

ACTUAL COST:

 

$5,626,052.75M

 

 

POPULATION:

 

 

819